Non-Works Costs
The Non-Works Costs section is accessed through the planned tab in Asprey Contracts once a project has been selected from the Project Centre.

Non-Works Costs are costs that do not form part of an SOR against an asset or component, nor do they form part of a valuation.

| Icon | Description | 
|---|---|
|  | Saves the changes made to the grid. | 
|  | Cancels any changes made in the grid. | 
|  | Adds a new line in the grid. | 
|  | Deleted the currently selected line. | 