8.2 ASSESSMENT COMPLIANCE

This report shows the number of assets with overdue assessments on the selected date.

image-20240219-112651.png

Overdue Date: The date to use to determine if an asset is overdue.

eg. If an Overdue Date of 29/08/2012 is set any assets that would be overdue on that date if not re-inspected beforehand are shown as Overdue. Any assets that are not overdue on the date are shown as Not Due.

Potential Weeks: An offset in weeks that is added to the Overdue Date. Any assets that fall into this band are shown as potentially due for inspection in the near future. This makes it easy to see how many assets need re-inspection in the potential period.

Generate: Starts the report.

image-20240219-112842.png