Skip to main content
Skip table of contents

8.1 OVERDUE ASSESSMENTS

This report shows a list the last assessment for each asset where the assessment is overdue by the selected date.

image-20240219-112223.png

Overdue Date: The date to use to determine if an asset needs re-inspection. An asset only needs re-inspection if its asset type has a repeat amount of days enabled in the survey design. This amount of days is added to the original survey date to determine if the next survey is overdue.

eg. If an asset needed re-inspection on the 29/08/2012 any Overdue Date from this day onwards would show the asset as needing re-inspection. Any Overdue Date prior to 29/08/2012 would not show the asset.

Survey: The survey(s) of the assessment to report on.

Generate: Starts the report.

image-20240219-112357.png

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.